XXL Rotting Tunnels By Eggersmann For Composting Plant in Luxembourg

XXL Rotting Tunnels By Eggersmann For Composting Plant in Luxembourg
6 Jul 2022  |
Eggersmann Anlagenbau built a new composting plant in Monnerich, Luxembourg for the client syndicate Minett-Kompost. The official inauguration took place on 1 July 2022 in the presence of Luxembourg's Minister of the Environment Joëlle Welfring.

Eggersmann Anlagenbau replaced an aging composting plant of the “Wendelin” type with state-of-the-art technology. Due to the hall geometry of the old plant, the longest Eggersmann rotting tunnels to date, 42 meters in length, were built here. A total of 8 rotting tunnels with tunnel filling units as well as the associated conveying and exhaust air technology were included in the scope of supply. In addition, a FORUS shredder, a TERRA SELECT trommel screen, and a star screen deck, also from Eggersmann, are used in the new plant – all are operated purely electrically.

Material after treatment in the rotting tunnel before further treatment

The plant processes a large part of Luxembourg’s organic and green waste. The throughput amounts to 20,000 tons per year.

More in Case Studies

Share this article

This article is published by

The Eggersmann Group, based in Marienfeld in East Westphalia is an association of companies at a national and international level with business operations in the areas of “construction”, recycling” and “composting”. About two thirds of the...

Related Articles