
Eggersmann Anlagenbau replaced an aging composting plant of the “Wendelin” type with state-of-the-art technology. Due to the hall geometry of the old plant, the longest Eggersmann rotting tunnels to date, 42 meters in length, were built here. A total of 8 rotting tunnels with tunnel filling units as well as the associated conveying and exhaust air technology were included in the scope of supply. In addition, a FORUS shredder, a TERRA SELECT trommel screen, and a star screen deck, also from Eggersmann, are used in the new plant – all are operated purely electrically.

The plant processes a large part of Luxembourg’s organic and green waste. The throughput amounts to 20,000 tons per year.
The Eggersmann Group, based in Marienfeld in East Westphalia is an association of companies at a national and international level with business operations in the areas of “construction”, recycling” and “composting”. About two thirds of the approx. 900 employees are located at the 13 German locations while one third are spread over the international ...